Wolverhampton Tower Blocks
Wolverhampton Tower Blocks

Download our Project Insider to Find Out More

Wolverhampton Tower Blocks

Project Details

Project: Carbon Fibre Strengthening

Contract Duration: 3 months

Scope of Work: Working on behalf of some large contractors and very closely with Wolverhampton Council, CCUK has designed Carbon Fibre Strengthening solutions to enable the refurbishment of the HRRB’s for electrical, mechanical and sprinkler installation.

If you would like to request more information, please fill out the contact form.

Reinventing Waterproofing Solutions: Introducing CCUK's Innovative ApproachBlogCCUK NewsStructural Rehabilitation and RepairStructural Strengthening Division
April 15, 2024

Advancing Infrastructure: The Evolution of Structural Fibre Polymer Composites

In the realm of modern engineering, the quest for innovative materials and techniques to enhance structural performance is perpetual. Amidst this pursuit, fibre polymer composites…
Reinventing Waterproofing Solutions: Introducing CCUK's Innovative ApproachBlogCarbon Fibre StrengtheningCCUK NewsHydrophobic & Hydrophilic Leak SealingPipeline & Liquid StorageSurface Preparations
April 15, 2024

Reinventing Waterproofing Solutions: Introducing CCUK’s Innovative Approach

In the dynamic world of construction and infrastructure, the quest for durability, longevity, and resilience remains paramount. As challenges evolve and demands intensify, so too…
The Role of Advanced Composites in Reinventing Transportation InfrastructureBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningConcrete Repairs & Specialist Work DivisionStructural Strengthening Division
March 5, 2024

Reinventing Energy Infrastructure: The Role of Composite Technology in Modern Power Systems

The modernisation of energy infrastructure is a pivotal aspect of advancing our global energy capabilities. Central to this transformation is the integration of composite technology,…