Piccadilly Tower | Manchester
Piccadilly Tower | Manchester

Download our Project Insider

Piccadilly Tower | Manchester

Project Details

Project: Carbon Fibre Strengthening, Crack Injections and Concrete Repairs

Contract Duration: 8 Weeks

Scope of Work: During the standard refurbishment it was highlighted by main contractor that the soffit panels appeared to be severely damaged. Some of the concrete panels that formed the construction of the floor slabs had suffered some deterioration and damage over the years. 

If you would like to request more information, please fill out the contact form.

How Durable and Reliable is FRP (Fibre Reinforced Polymer)? BlogCarbon Fibre Strengthening
April 11, 2022

How Durable and Reliable is FRP (Fibre Reinforced Polymer)?

A detailed article exploring how durable and reliable FRP is, based upon 25 years of durability testing Over the last 25 years especially (3), our…
The Do's and Don'ts of Using Carbon Fibre Strengthening Materials BlogCarbon Fibre Strengthening
February 1, 2022

The Do’s and Don’ts of Using Carbon Fibre Strengthening Materials

A comprehensive guide offering technical advice about carbon fibre strengthening materials and how to properly prepare and handle carbon fibre composites Carbon fibre is a…
Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures? BlogCarbon Fibre Strengthening
February 1, 2022

Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures?

In this comprehensive guide, we answer the important question of `is carbon fibre a sustainable material?` and more questions about environmentally-friendly strengthening solutions   When…