Piccadilly Tower | Manchester
Piccadilly Tower | Manchester

Download our Project Insider to Find Out More

Piccadilly Tower | Manchester

Project Details

Project: Carbon Fibre Strengthening, Crack Injections and Concrete Repairs

Contract Duration: 8 Weeks

Scope of Work: During the standard refurbishment it was highlighted by main contractor that the soffit panels appeared to be severely damaged. Some of the concrete panels that formed the construction of the floor slabs had suffered some deterioration and damage over the years. 

If you would like to request more information, please fill out the contact form.

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
July 28, 2021

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods

How to strengthen concrete columns? Column strengthening is a process within concrete repairs that involves adding or restoring to the `load capacity`, or how much…
'Concrete Goals' by Business Works Magazine Blog
July 23, 2021

‘Concrete Goals’ by Business Works Magazine

Composites Construction UK (CCUK) founder Jamie Dempster is targeting the Humber and M62 energy corridor with his expanded range of structural repair services. He talks…
Top 3 Pipe Rehabilitation Methods BlogPipeline & Liquid Storage
July 19, 2021

Top 3 Pipe Rehabilitation Methods

Which pipe rehabilitation method should I choose? Pipe rehabilitation is common practice for ageing pipelines or those that have carried large volumes of liquid repeatedly,…