Piccadilly Tower | Manchester
Piccadilly Tower | Manchester

Download our Project Insider to Find Out More

Piccadilly Tower | Manchester

Project Details

Project: Carbon Fibre Strengthening, Crack Injections and Concrete Repairs

Contract Duration: 8 Weeks

Scope of Work: During the standard refurbishment it was highlighted by main contractor that the soffit panels appeared to be severely damaged. Some of the concrete panels that formed the construction of the floor slabs had suffered some deterioration and damage over the years. 

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…