CANTILEVER STRENGTHENING, CRACK REPAIRS & WATERPROOFING

Duration:

2 Weeks

Kings Road | London
Kings Road | London

Project Details

Scope of Work: Following our successful projects in Cadogan square the previous years we were contacted again by Civic Engineers to provide innovative strengthening and repair solutions to these protected balconies, but this time on the world famous Kings Road in London! Cantilever strengthening, crack repairs and waterproofing works were required to these protected structures, the visual image of these balconies are protected by the City of London and whatever works you carry out have to be sympathetic to the structure and the environment, as you will understand you can’t just do what you want in this area of town.

The Challenge

Directly facing the Kings Road and working in a very tight space, the works also had to be coordinated with other façade works being carried out and also with a deal of sympathy to the tenants working above the shop. Due to the failure of a previous waterproofing system the balconies had become saturated through with rainwater which meant temporary weathering had to be placed and a ‘drying’ out process carried out

The Solution

The first job was to attack the crack repairs, with cracks in both directions all the way through the balconies. It was decided to strengthen across the cracks perpendicular using NSM (near surface mounting) of Tyfo Carbon Fibre Plates. Narrow grooves were cut into the substrate at set centres on both the top and also the underside of the balcony, then small lengths of carbon fibre plate were resin bonded into the grooves (like stitches to a wound) before the surface filled and coloured with epoxy resin to match the existing substrate. Next was the installation of a Tyfo GFRP (structural glass fibre) wrap system in both directions to both the top and the undersides of the balconies, followed by the fixing of steel cantilever brackets on top of the balconies that were bolted to a pad stone constructed within the masonary of the structure. The final applications were a thin coat of polymer modified mortar on the underside, to cover the GFRP and provide an aesthetic ‘stone’ look and a Sika waterproofing system to the top finished in a grey colour.

The Result

A non-intrusive, sympathetic repair using the innovative Tyfo carbon Fibre materials as a hybrid solution with GFRP, steel, resins and mortars to provide a structurally sound and aesthetically acceptable repair that the shoppers on the Kings Road in London will enjoy for many years.

Download our Project Insider
Download Here >
Kings Road | London
Best practices for ensuring long-term structural integrityBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionConcrete Repairs & Specialist Work DivisionStructural Rehabilitation and RepairStructural Strengthening Division
October 7, 2024

Advanced materials in structural reinforcement: What you need to know

With ageing infrastructure and increasing demands on buildings, bridges and other structures, advanced materials in structural reinforcement have become essential. These materials, such as carbon…
Best practices for ensuring long-term structural integrityBlogCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionConcrete Repairs & Specialist Work DivisionStructural Strengthening Division
October 6, 2024

Best practices for ensuring long-term structural integrity

Maintaining the structural integrity of buildings, bridges and other infrastructure is essential for safety, functionality and longevity. As structures age or face increasing demands, reinforcing…
Innovative Solutions in Structural ReinforcementBlogCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionSprayed Concrete ServicesStructural Rehabilitation and RepairStructural Strengthening Division
September 3, 2024

Innovative Solutions in Structural Reinforcement

Structural reinforcement has seen significant advancements over the past few decades. This has been driven by the need to extend the life of old infrastructure,…