Slab Strengthening for Service Penetrations – A Hotel
Slab Strengthening for Service Penetrations – A Hotel

Request more information

Project Details

Project: Premier Inn Hotel London

Client: Barnes Construction

Contract Duration: 4 weeks

Scope of Works: Carbon Fibre slab strengthening for penetrations.

An office to hotel conversion in Kingston Upon Thames was the project for Barnes Construction from Suffolk. The original 1960’s concrete framed building in the town centre had quite restrictive head room between slabs. We were contacted by the clients consulting engineers to help with the transfer of loads through the slabs due to cutting of the reinforcement through drilling service holes.

If you would like to request more information, please fill out the contact form.

How Durable and Reliable is FRP (Fibre Reinforced Polymer)? BlogCarbon Fibre Strengthening
April 11, 2022

How Durable and Reliable is FRP (Fibre Reinforced Polymer)?

A detailed article exploring how durable and reliable FRP is, based upon 25 years of durability testing Over the last 25 years especially (3), our…
The Do's and Don'ts of Using Carbon Fibre Strengthening Materials BlogCarbon Fibre Strengthening
February 1, 2022

The Do’s and Don’ts of Using Carbon Fibre Strengthening Materials

A comprehensive guide offering technical advice about carbon fibre strengthening materials and how to properly prepare and handle carbon fibre composites Carbon fibre is a…
Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures? BlogCarbon Fibre Strengthening
February 1, 2022

Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures?

In this comprehensive guide, we answer the important question of `is carbon fibre a sustainable material?` and more questions about environmentally-friendly strengthening solutions   When…