Slab Strengthening for Service Penetrations – A Hotel
Slab Strengthening for Service Penetrations – A Hotel

Request more information

Project Details

Project: Premier Inn Hotel London

Client: Barnes Construction

Contract Duration: 4 weeks

Scope of Works: Carbon Fibre slab strengthening for penetrations.

An office to hotel conversion in Kingston Upon Thames was the project for Barnes Construction from Suffolk. The original 1960’s concrete framed building in the town centre had quite restrictive head room between slabs. We were contacted by the clients consulting engineers to help with the transfer of loads through the slabs due to cutting of the reinforcement through drilling service holes.

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…