Slab Strengthening – Hoares Bank
Slab Strengthening – Hoares Bank

Request more information

Project Details

Project: Hoares Bank

Client: Vinci Construction

Contract Duration: 12 weeks

Scope of Works: Slab strengthening with Tyfo SCH Systems to meet current office loadings and allow the retainment of listed facades.

This 1904 office building was being refurbished for the administration department of a private bank in London’s Fleet Street. Composites Construction UK designed and installed the Tyfo Fibrwrap Carbon Fibre Strengthening system to achieve the clients requirements. The design was for two layers of our SCH systems applied in double thickness at 300mm width strips at 600mm centres. This application allowed the effective design and install of all M&E services.

If you would like to request more information, please fill out the contact form.

How Durable and Reliable is FRP (Fibre Reinforced Polymer)? BlogCarbon Fibre Strengthening
April 11, 2022

How Durable and Reliable is FRP (Fibre Reinforced Polymer)?

A detailed article exploring how durable and reliable FRP is, based upon 25 years of durability testing Over the last 25 years especially (3), our…
The Do's and Don'ts of Using Carbon Fibre Strengthening Materials BlogCarbon Fibre Strengthening
February 1, 2022

The Do’s and Don’ts of Using Carbon Fibre Strengthening Materials

A comprehensive guide offering technical advice about carbon fibre strengthening materials and how to properly prepare and handle carbon fibre composites Carbon fibre is a…
Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures? BlogCarbon Fibre Strengthening
February 1, 2022

Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures?

In this comprehensive guide, we answer the important question of `is carbon fibre a sustainable material?` and more questions about environmentally-friendly strengthening solutions   When…