Slab Strengthening – Hoares Bank
Slab Strengthening – Hoares Bank

Request more information

Project Details

Project: Hoares Bank

Client: Vinci Construction

Contract Duration: 12 weeks

Scope of Works: Slab strengthening with Tyfo SCH Systems to meet current office loadings and allow the retainment of listed facades.

This 1904 office building was being refurbished for the administration department of a private bank in London’s Fleet Street. Composites Construction UK designed and installed the Tyfo Fibrwrap Carbon Fibre Strengthening system to achieve the clients requirements. The design was for two layers of our SCH systems applied in double thickness at 300mm width strips at 600mm centres. This application allowed the effective design and install of all M&E services.

If you would like to request more information, please fill out the contact form.

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
July 28, 2021

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods

How to strengthen concrete columns? Column strengthening is a process within concrete repairs that involves adding or restoring to the `load capacity`, or how much…
'Concrete Goals' by Business Works Magazine Blog
July 23, 2021

‘Concrete Goals’ by Business Works Magazine

Composites Construction UK (CCUK) founder Jamie Dempster is targeting the Humber and M62 energy corridor with his expanded range of structural repair services. He talks…
Top 3 Pipe Rehabilitation Methods BlogPipeline & Liquid Storage
July 19, 2021

Top 3 Pipe Rehabilitation Methods

Which pipe rehabilitation method should I choose? Pipe rehabilitation is common practice for ageing pipelines or those that have carried large volumes of liquid repeatedly,…