Project: Hoares Bank

Client: Vinci Construction

Contract Duration: 12 weeks

Scope of Works: Slab strengthening with Tyfo SCH Systems to meet current office loadings and allow the retainment of listed facades.

This 1904 office building was being refurbished for the administration department of a private bank in London’s Fleet Street. Composites Construction UK designed and installed the Tyfo Fibrwrap Carbon Fibre Strengthening system to achieve the clients requirements. The design was for two layers of our SCH systems applied in double thickness at 300mm width strips at 600mm centres. This application allowed the effective design and install of all M&E services.

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…