Download our Project Insider to Find Out More

Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

Composite pipeline repair services for industrial pipe rehabilitationBlog
November 9, 2026

Composite pipeline repair services for industrial pipe rehabilitation

A repair can be significant because it restores a section of pipe without replacing it. One example of composite pipeline repair involved a 16-inch...
Culvert Repair and Strengthening Services in the UKBlog
November 4, 2026

Culvert Repair and Strengthening Services in the UK

A culvert showing cracks, water ingress, erosion, damaged headwalls or restricted flow may need repair, refurbishment or strengthening, rather than...
Engineer inspecting CFRP laminates bonded beneath a concrete beam in a UK car parkBlog
November 3, 2026

CFRP Design Calculations for Bending Strengthening

The decisive question in bending strengthening is not simply how much CFRP can be added, but where it can contribute effectively to the required...