Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

Structural Strengthening Design for Concrete Structures UK: A Technical GuideBlog
May 19, 2026

Structural Strengthening Design for Concrete Structures UK: A Technical Guide

The perceived necessity of decommissioning compromised concrete assets often obscures the technical viability of advanced intervention, representing...
Advanced Masonry Reinforcement Techniques UK: A Technical Guide to Structural RemediationBlog
May 18, 2026

Advanced Masonry Reinforcement Techniques UK: A Technical Guide to Structural Remediation

The traditional reliance on reactive crack-stitching is no longer sufficient to meet the rigorous demands of the second-generation Eurocode 6...
A Technical Guide to Resin Injection: Structural Remediation and Leak SealingBlog
May 15, 2026

A Technical Guide to Resin Injection: Structural Remediation and Leak Sealing

The long-term viability of critical infrastructure is frequently dictated by the precision of chemical interventions at the molecular level, where...