Download our Project Insider to Find Out More

Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

Is Carbon Fibre Reinforcement Worth It? A Benefit GuideBlog
June 15, 2026

Is Carbon Fibre Reinforcement Worth It? A Benefit Guide

What if the most expensive material on a procurement list actually delivered the lowest total project cost? For many asset controllers facing the...
How Long Does Carbon Fibre Reinforcement Last? CFRP LifespanBlog
June 14, 2026

How Long Does Carbon Fibre Reinforcement Last? CFRP Lifespan

Whilst traditional concrete remediation often necessitates cyclical maintenance every decade, Carbon Fibre Reinforced Polymer (CFRP) systems are...
Carbon Fibre vs Steel Reinforcement: Which Is Best?Blog
June 13, 2026

Carbon Fibre vs Steel Reinforcement: Which Is Best?

Carbon fibre can be up to ten times stronger than steel by weight, yet many asset controllers still default to traditional metal plates when...