Old Granada Studios
Old Granada Studios

Download our Project Insider to Find Out More

Old Granada Studios

Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
July 28, 2021

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods

How to strengthen concrete columns? Column strengthening is a process within concrete repairs that involves adding or restoring to the `load capacity`, or how much…
'Concrete Goals' by Business Works Magazine Blog
July 23, 2021

‘Concrete Goals’ by Business Works Magazine

Composites Construction UK (CCUK) founder Jamie Dempster is targeting the Humber and M62 energy corridor with his expanded range of structural repair services. He talks…
Top 3 Pipe Rehabilitation Methods BlogPipeline & Liquid Storage
July 19, 2021

Top 3 Pipe Rehabilitation Methods

Which pipe rehabilitation method should I choose? Pipe rehabilitation is common practice for ageing pipelines or those that have carried large volumes of liquid repeatedly,…