Project Details

Project: London South Bank University

Contract Duration: 14 months

Scope of Works: Carbon Fibre Strengthening

LSBU is by far the largest carbon fibre strengthening project carried out in a building in the UK to date. This design and build project resulted in over 8000m2 of Tyfo Fibrwrap Carbon Fibre Strengthening Systems being installed. 

If you would like to request more information, please fill out the contact form.

Is Carbon Fibre Reinforcement Worth It? A Benefit GuideBlog
June 15, 2026

Is Carbon Fibre Reinforcement Worth It? A Benefit Guide

What if the most expensive material on a procurement list actually delivered the lowest total project cost? For many asset controllers facing the...
How Long Does Carbon Fibre Reinforcement Last? CFRP LifespanBlog
June 14, 2026

How Long Does Carbon Fibre Reinforcement Last? CFRP Lifespan

Whilst traditional concrete remediation often necessitates cyclical maintenance every decade, Carbon Fibre Reinforced Polymer (CFRP) systems are...
Carbon Fibre vs Steel Reinforcement: Which Is Best?Blog
June 13, 2026

Carbon Fibre vs Steel Reinforcement: Which Is Best?

Carbon fibre can be up to ten times stronger than steel by weight, yet many asset controllers still default to traditional metal plates when...