Power Station Pipe Strengthening
Power Station Pipe Strengthening

Request more information

Project Details

Project: Humber Power Station

Client: SHB Power

Contract Duration: 4 days

Scope of Work: Repair and strengthening of Cooling water inlet pipes from scouring and erosion using Tyfo Fibrwrap FRP systems and Tyfo specialist under
water epoxy

South Humber Bank Power Station (SHB) had a leak remediation and strengthening issue on their cooling water intake pipes. During a planned shutdown CCUK carried out extensive internal repairs, leak sealing and carbon fibre strengthening to these critical pieces of infrastructure.

If you would like to request more information, please fill out the contact form.

How Durable and Reliable is FRP (Fibre Reinforced Polymer)? BlogCarbon Fibre Strengthening
April 11, 2022

How Durable and Reliable is FRP (Fibre Reinforced Polymer)?

A detailed article exploring how durable and reliable FRP is, based upon 25 years of durability testing Over the last 25 years especially (3), our…
The Do's and Don'ts of Using Carbon Fibre Strengthening Materials BlogCarbon Fibre Strengthening
February 1, 2022

The Do’s and Don’ts of Using Carbon Fibre Strengthening Materials

A comprehensive guide offering technical advice about carbon fibre strengthening materials and how to properly prepare and handle carbon fibre composites Carbon fibre is a…
Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures? BlogCarbon Fibre Strengthening
February 1, 2022

Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures?

In this comprehensive guide, we answer the important question of `is carbon fibre a sustainable material?` and more questions about environmentally-friendly strengthening solutions   When…