How Durable and Reliable is FRP (Fibre Reinforced Polymer)?
A detailed article exploring how durable and reliable FRP is, based upon 25 years of durability testing Over the last 25 years especially (3), our…
Project: Humber Power Station
Client: SHB Power
Contract Duration: 4 days
Scope of Work: Repair and strengthening of Cooling water inlet pipes from scouring and erosion using Tyfo Fibrwrap FRP systems and Tyfo specialist under
water epoxy
South Humber Bank Power Station (SHB) had a leak remediation and strengthening issue on their cooling water intake pipes. During a planned shutdown CCUK carried out extensive internal repairs, leak sealing and carbon fibre strengthening to these critical pieces of infrastructure.
If you would like to request more information, please fill out the contact form.