Old Granada Studios
Old Granada Studios

Download our Project Insider to Find Out More

Old Granada Studios

Project Details

Project: Carbon Fibre Strengthening, Concrete Repairs and Protection Works

Contract Duration: 12 Weeks

Scope of Work: CCUK successfully designed and delivered carbon fibre strengthening works to all 9 floors of this exclusive development. Strengthening was carried out around the columns for punching shear along with column strengthening for axial loading and beam strengthening for flexure.

If you would like to request more information, please fill out the contact form.

When to Choose Carbon Fibre Over Steel for Structural RepairsBlogCarbon Fibre StrengtheningHydrophobic & Hydrophilic Leak Sealing
November 10, 2025

When to Choose Carbon Fibre Over Steel for Structural Repairs

When it comes to structural repair and strengthening, the choice between carbon fibre and steel can have a major impact on performance, cost and long-term…
Top 5 Benefits of Carbon Fibre Strengthening for Infrastructure ProjectsBlogCarbon Fibre StrengtheningCCUK News
November 10, 2025

Top 5 Benefits of Carbon Fibre Strengthening for Infrastructure Projects

There are many advantages to choosing carbon fibre reinforcement, such as its exceptional tensile strength whilst adding virtually no extra load to the structure. Below…
Waterproofing Solutions Compared: Spray-Applied vs Liquid-Applied SystemsBlogCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionConcrete Repairs & Specialist Work DivisionStructural Rehabilitation and RepairStructural Strengthening Division
October 14, 2025

Carbon Fibre Strengthening: The Low-Impact Solution for Structural Repairs

When your structures show signs of deterioration, finding a repair method that is effective, efficient and non-disruptive is vital. At Composites Construction UK, we specialise…