Immingham Jetty
Immingham Jetty

Download our Project Insider to Find Out More

Immingham Jetty

Project Details

Project: Immingham Jetty

Client: APT Oil

Contract Duration: 2 weeks

Scope of Works: Survey of the damage to the Concrete Jetty

The client approached us in 2020 in relation to carrying out some concrete repairs to the jetty, unfortunately the condition survey dated back to 2016 and there had been a number of key personnel changes on the site that resulted in poorly or unfinished works. It was decided that a new condition survey should be carried out due to the time elapsed since the repairs were last looked at.

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…