Crack Repairs and Environmental Protection
Crack Repairs and Environmental Protection

Request more information

Project Details

Project: Pier Protection – Phase II

Client: Bristol Port Company

Contract Duration: 8 weeks

Scope of Works: Coastal Protection works of two concrete pier support columns dimensions 10m high x 3m wide by 1m thick.

Due to the great success in 2012 when we provided coastal erosion protection to 3 x smaller support columns, Bristol Port Company immediately saw the value in extending the life of these vital support columns at the entrance to the port at Avonmouth. The pier columns when cast where considerably larger than the reduced size of 10m high, 3m wide and 1m thick. To ensure no further erosion we wrapped these columns with Tyfo Systems epoxy.

If you would like to request more information, please fill out the contact form.

What are the Environmental Benefits of Carbon Fibre Strengthening?BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
June 3, 2024

What are the Environmental Benefits of Carbon Fibre Strengthening?

Carbon fibre is the choice of strengthening material for a plethora of reasons. You might be shocked to know that the benefits of carbon fibre…
Avoiding Mistakes When Applying Carbon Fibre Strengthening in the UKBlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
June 3, 2024

Avoiding Mistakes When Applying Carbon Fibre Strengthening in the UK

Carbon fibre is one of the most versatile structural strengthening materials on the UK market. As flexible as it is, the super material does have…
Reinventing Waterproofing Solutions: Introducing CCUK's Innovative ApproachBlogCCUK NewsStructural Rehabilitation and RepairStructural Strengthening Division
April 15, 2024

Advancing Infrastructure: The Evolution of Structural Fibre Polymer Composites

In the realm of modern engineering, the quest for innovative materials and techniques to enhance structural performance is perpetual. Amidst this pursuit, fibre polymer composites…