Crack Repairs and Environmental Protection
Crack Repairs and Environmental Protection

Request more information

Project Details

Project: Pier Protection – Phase II

Client: Bristol Port Company

Contract Duration: 8 weeks

Scope of Works: Coastal Protection works of two concrete pier support columns dimensions 10m high x 3m wide by 1m thick.

Due to the great success in 2012 when we provided coastal erosion protection to 3 x smaller support columns, Bristol Port Company immediately saw the value in extending the life of these vital support columns at the entrance to the port at Avonmouth. The pier columns when cast where considerably larger than the reduced size of 10m high, 3m wide and 1m thick. To ensure no further erosion we wrapped these columns with Tyfo Systems epoxy.

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…