Hinckley Point B Nuclear Flask Wash Coating

Request more information

Project Details

Project: Relining of the nuclear flask wash bunds

Client: EDF Energy

Contract Duration: 3 weeks

Scope of Work: Bund Coating

The previous coating to this tiled bund had started to fail and de-bond. CCUK carried out extensive testing to ensure the GFRP coating would adhere to the substrate with minimum surface preparation. A coating of Fibrwrap GFRP systems with a durable epoxy coating was applied to all the tiled surfaces within this critical piece of infrastructure. The works were carried out in a very short period of time under challenging health, safety and environment conditions.

If you would like to request more information, please fill out the contact form.

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
July 28, 2021

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods

How to strengthen concrete columns? Column strengthening is a process within concrete repairs that involves adding or restoring to the `load capacity`, or how much…
'Concrete Goals' by Business Works Magazine Blog
July 23, 2021

‘Concrete Goals’ by Business Works Magazine

Composites Construction UK (CCUK) founder Jamie Dempster is targeting the Humber and M62 energy corridor with his expanded range of structural repair services. He talks…
Top 3 Pipe Rehabilitation Methods BlogPipeline & Liquid Storage
July 19, 2021

Top 3 Pipe Rehabilitation Methods

Which pipe rehabilitation method should I choose? Pipe rehabilitation is common practice for ageing pipelines or those that have carried large volumes of liquid repeatedly,…