Project: McBains Cooper, London
Client: Bristol Port Company
Contract Duration: 3 weeks
Scope of Works: Repairs to a structural crack on a dock wall within the lock gates at Royal Portbury Dock Bristol. Works included crack repairs, sprayed concrete and environmental protection using Fibrwrap Systems
On the west stub pier the inspection engineers had noted a crack in the inner dock wall, being unsure whether it was a construction joint or not Composites Construction UK (Fibrwrap) were asked to provide remedial repair to the crack and protection from the water ingress using Tyfo Fibrwrap Systems.