Coastal Erosion Prevention – Royal Portbury Dock
Coastal Erosion Prevention – Royal Portbury Dock

Request more information

Project Details

Project: Royal Portbury Dock

Client: Bristol Port Authority

Contract Duration: July/August 2012

Scope of Works: Repair and Protection of the West Stub Pier support columns

The erosion process caused by the sea had reduced the columns to approximately the size they should have been at construction. In addition the shape and size of the columns had become very irregular. The initial brief from the client was that they had assumed the columns were suitable in size and strength however they required protection from any further coastal erosion.

Composites Construction UK (Fibrwrap) has provided a solution to repair and protect these columns using unique solutions of TYFO Fibrwrap Systems.

If you would like to request more information, please fill out the contact form.

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
July 28, 2021

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods

How to strengthen concrete columns? Column strengthening is a process within concrete repairs that involves adding or restoring to the `load capacity`, or how much…
'Concrete Goals' by Business Works Magazine Blog
July 23, 2021

‘Concrete Goals’ by Business Works Magazine

Composites Construction UK (CCUK) founder Jamie Dempster is targeting the Humber and M62 energy corridor with his expanded range of structural repair services. He talks…
Top 3 Pipe Rehabilitation Methods BlogPipeline & Liquid Storage
July 19, 2021

Top 3 Pipe Rehabilitation Methods

Which pipe rehabilitation method should I choose? Pipe rehabilitation is common practice for ageing pipelines or those that have carried large volumes of liquid repeatedly,…