Carbon Fibre Strengthening – Merchant Taylor School
Carbon Fibre Strengthening – Merchant Taylor School

Request more information

Project Details

Project: Merchant Taylor School

Client: Borras Construction

Contract Duration: 2 weeks

Scope of Works: Slab strengthening against punching shear.

Merchant Taylor School in Northwood London is an independent day school for boys that was first established in 1561. Borras were awarded the contract to construct a new two-storey building and work began on site in March 2014. CCUK was employed by Borras to rectify a lack of reinforcement at eight locations over columns in a slab within the existing building in December 2014. Three layers of carbon fibre fabric was designed an applied by CCUK (Fibrwrap) to the top of the slab in both directions at each column location.

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…