Project: South Audley Street
Client: McLaren Construction
Contract Duration: 3 weeks
Scope of Works: Carbon Fibre Strengthening to Retaining Wall.
McLaren Projects of London requested us to carry out Carbon Fibre Strengthening to a retaining wall on their exclusive residential project in Mayfair. The project included excavation below street level to allow for two underground car parks, a swimming pool and gymnasium and as such the retaining wall below street level required strengthening. Concrete repairs and surface preparation was carried out by CCUK before the application of the Carbon Fibre Strengthening.
If you would like to request more information, please fill out the contact form.