Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Is Your Structure Failing? Here’s When to Consider Carbon Fibre StrengtheningBlogSurface PreparationsWaterproof Solutions
June 16, 2025

Top Waterproofing Systems for Commercial Infrastructure in 2025

Waterproofing remains one of the most essential components in the longevity and performance of commercial infrastructure. In 2025, evolving building regulations, climate resilience and asset…
Is Your Structure Failing? Here’s When to Consider Carbon Fibre StrengtheningBlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work DivisionStructural Rehabilitation and RepairStructural Strengthening Division
June 16, 2025

Is Your Structure Failing? Here’s When to Consider Carbon Fibre Strengthening

Detecting early signs of structural distress is vital to avoiding costly repairs or safety hazards. Fortunately, carbon fibre strengthening offers a minimally invasive way to…
Concrete Magazine - May EditionBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningCCUK NewsConcrete Repairs & Specialist Work DivisionUncategorized
May 20, 2025

Concrete Magazine – May Edition

Old Granada Studios in Manchester is an iconic landmark with a rich history. Once the headquarters of Granada Television, the studios have been home to…