Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Structural Blast Retrofitting Methods and Material ChoicesBlog
November 20, 2026

Structural Blast Retrofitting Methods and Material Choices

Blast retrofitting is designed to reduce harm, not make a building indestructible. Structural blast retrofitting combines engineering assessment,...
Bridge Integrity Services for Root-Cause Analysis and RemediationBlog
November 18, 2026

Bridge Integrity Services for Root-Cause Analysis and Remediation

The right repair starts with the cause, not the visible defect. Bridge integrity services bring together structural surveys, testing and engineering...
Lift Pit Leak Sealing at Wall-to-Floor JointsBlog
November 16, 2026

Lift Pit Leak Sealing at Wall-to-Floor Joints

A lift pit leak often points to a failed joint or another route through the structure, rather than a problem that can be solved by…