Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Cost-Benefit Analysis of Structural Strengthening: A Technical Guide for Asset ManagersBlog
June 30, 2026

Cost-Benefit Analysis of Structural Strengthening: A Technical Guide for Asset Managers

The assumption that full asset replacement provides the most predictable long-term value is increasingly challenged by the superior life-cycle...
The Whole-Life Cost of CFRP Repairs: A Strategic Engineering AnalysisBlog
June 29, 2026

The Whole-Life Cost of CFRP Repairs: A Strategic Engineering Analysis

The pursuit of the lowest initial tender price is frequently the most expensive decision an asset manager can make when addressing structural...
Budgeting for Large-Scale Concrete Repairs: A Technical Guide for Asset ManagersBlog
June 26, 2026

Budgeting for Large-Scale Concrete Repairs: A Technical Guide for Asset Managers

The traditional reliance on reactive maintenance cycles represents a systemic failure in asset management that often accelerates structural...