Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

The Cost of Delayed Structural Maintenance: A Technical Analysis of Asset DepreciationBlog
July 7, 2026

The Cost of Delayed Structural Maintenance: A Technical Analysis of Asset Depreciation

Research indicates that for every £1 of deferred maintenance, an asset owner may face a compounding penalty of £4 or more in eventual restoration...
Presenting Structural Repair Options to a Board: A Technical Guide for Asset ManagersBlog
July 6, 2026

Presenting Structural Repair Options to a Board: A Technical Guide for Asset Managers

The most technically sound repair strategy will inevitably fail if it is presented as an isolated cost rather than a strategic investment in risk...
Bridge Pier Strengthening: Advanced CFRP Solutions for UK InfrastructureBlog
July 3, 2026

Bridge Pier Strengthening: Advanced CFRP Solutions for UK Infrastructure

Did you know that carbon fibre reinforced polymer (CFRP) possesses a strength-to-weight ratio ten times greater than traditional steel, yet it can be...