Download our Project Insider to Find Out More

Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

The Critical Risks of Using Non-Specialist Repair Contractors for Structural RemediationBlog
July 23, 2026

The Critical Risks of Using Non-Specialist Repair Contractors for Structural Remediation

The assumption that a general civil engineering firm possesses the requisite precision to execute advanced structural remediation is a high-stakes...
Common Mistakes in Concrete Repair Projects: An Engineer’s Guide to Avoiding Structural FailureBlog
July 22, 2026

Common Mistakes in Concrete Repair Projects: An Engineer’s Guide to Avoiding Structural Failure

Could the persistent failure of structural remediation be attributed to a fundamental misunderstanding of the substrate's electrochemical behaviour...
Future-Proofing Buildings Against Increased Loads: A Technical Guide to Structural StrengtheningBlog
July 21, 2026

Future-Proofing Buildings Against Increased Loads: A Technical Guide to Structural Strengthening

The assumption that a building's load-bearing capacity remains a static, terminal value is being dismantled by the evolution of composite materials...