Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Commercial Basement Leak Sealing: Diagnosis, Methods and Project PlanningBlog
October 14, 2026

Commercial Basement Leak Sealing: Diagnosis, Methods and Project Planning

What if the visible damp patch is only the exit point, rather than the route water is taking through a commercial basement? Commercial basement leak...
Basement Resin Injection: Diagnosis, Methods and Repair DecisionsBlog
October 13, 2026

Basement Resin Injection: Diagnosis, Methods and Repair Decisions

Could the crack admitting water be a symptom rather than the whole problem? Basement resin injection can seal a route for water or contribute to…
Basement Retaining Wall Repair: Diagnosis, Options and EngineeringBlog
October 12, 2026

Basement Retaining Wall Repair: Diagnosis, Options and Engineering

A crack in a basement retaining wall may be only the visible symptom. Water pressure, drainage problems, ground movement or material deterioration...