Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Advanced Crack Injection: Technical Guide to Concrete Remediation and Structural SealingBlog
September 23, 2026

Advanced Crack Injection: Technical Guide to Concrete Remediation and Structural Sealing

Treating a concrete fissure merely as an aesthetic or moisture nuisance is one of the most perilous oversights in infrastructure management. Asset...
Structural Retrofitting of Existing Buildings: The Engineering GuideBlog
September 22, 2026

Structural Retrofitting of Existing Buildings: The Engineering Guide

Demolishing a compromised structure to build anew is rarely the most efficient engineering decision; instead, targeted remediation routinely...
Masonry Crack Stitching: A Technical Guide to Structural RemediationBlog
September 21, 2026

Masonry Crack Stitching: A Technical Guide to Structural Remediation

Did you know that uncertified structural cracking can diminish a commercial asset's valuation by as much as 20%, whilst frequently triggering...