Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Concrete Repair Contractors in London: A Guide to Structural Life-ExtensionBlog
August 26, 2026

Concrete Repair Contractors in London: A Guide to Structural Life-Extension

Carbon Fibre Reinforced Polymer (CFRP) possesses a strength-to-weight ratio approximately 10 times greater than structural steel, yet many asset...
Shoring Systems for Concrete Repair: Engineering GuideBlog
August 25, 2026

Shoring Systems for Concrete Repair: Engineering Guide

The structural integrity of a compromised asset is never more precarious than during the precise window when its load-bearing capacity is being...
Crack Stitching in Brickwork: A Technical Guide to Masonry Reinforcement and Structural RemediationBlog
August 24, 2026

Crack Stitching in Brickwork: A Technical Guide to Masonry Reinforcement and Structural Remediation

The structural integrity of a masonry façade is often compromised not by the visible fracture itself, but by the systemic failure to address the...