Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Advanced Composite Masonry Reinforcement Technical GuideBlog
September 3, 2026

Advanced Composite Masonry Reinforcement Technical Guide

Conventional steel reinforcement often introduces as many structural complications as it resolves; it frequently requires extensive demolition and...
Spalling Meaning: A Technical Guide to Concrete Delamination and RepairBlog
September 2, 2026

Spalling Meaning: A Technical Guide to Concrete Delamination and Repair

Approximately 10% of Great Britain's 71,000 bridges are currently classified as substandard; it's a statistic that underscores the critical nature of...
Concrete Pull-Off Test: A Technical Guide to Tensile Adhesion AssessmentBlog
September 1, 2026

Concrete Pull-Off Test: A Technical Guide to Tensile Adhesion Assessment

The structural integrity of a multi-million-pound carbon fibre strengthening project relies entirely on a bond interface only millimetres thick. For...