Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

CFRP Pipeline Repair UK: An Engineered Approach to Infrastructure RehabilitationBlog
September 9, 2026

CFRP Pipeline Repair UK: An Engineered Approach to Infrastructure Rehabilitation

Whilst traditional steel sleeves are often viewed as the standard response to structural degradation, engineered composite wrap systems are 73% more...
Structural Strengthening Contractors UK: A Technical Guide to Asset Life-ExtensionBlog
September 8, 2026

Structural Strengthening Contractors UK: A Technical Guide to Asset Life-Extension

Whilst the initial material cost of Carbon Fibre Reinforced Polymer (CFRP) is higher than structural steel, the total project expenditure is...
Alternatives to Traditional Underpinning: Advanced Structural Stabilisation for UK InfrastructureBlog
September 7, 2026

Alternatives to Traditional Underpinning: Advanced Structural Stabilisation for UK Infrastructure

For decades, the default response to foundation subsidence has been the invasive application of mass-pour concrete, yet modern engineering now offers...