Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Structural Upgrade for Industrial Facilities: A Technical Guide to Asset Life-ExtensionBlog
June 9, 2026

Structural Upgrade for Industrial Facilities: A Technical Guide to Asset Life-Extension

What if the most effective method to accommodate increased load demands from modern robotics is not to replace the structure, but to chemically...
Uncategorized
June 8, 2026

16 Years of Carbon Fibre Strengthening: The Story of Composites Construction UK

Composites Construction UK turns sixteen. It's worth saying that out loud, because sixteen years in a specialist construction niche is not a small thing. This…
Comprehensive Concrete Rehabilitation Strategies for UK Infrastructure: A Technical GuideBlog
June 8, 2026

Comprehensive Concrete Rehabilitation Strategies for UK Infrastructure: A Technical Guide

Nearly 3,000 council-maintained road bridges across Great Britain are currently classified as substandard, rendered incapable of supporting the...