Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Ground Beam Strengthening: Assessment, Methods and DesignBlog
October 7, 2026

Ground Beam Strengthening: Assessment, Methods and Design

Could strengthening a ground beam make the problem worse if its role in the foundation system is misunderstood? Cracking, movement or excessive...
Bridge Deck Strengthening: Methods, Design and DeliveryBlog
October 6, 2026

Bridge Deck Strengthening: Methods, Design and Delivery

The fastest route to an unnecessary bridge replacement may be choosing a strengthening material before understanding the deck’s load path. Effective...
Bridge Pier Strengthening: Assessment, Design and Repair OptionsBlog
October 5, 2026

Bridge Pier Strengthening: Assessment, Design and Repair Options

A visible defect is not always the governing problem. Cracking or concrete spalling may point to a durability issue, a loss of structural capacity,...