Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

The Role of a Specialist Engineering Contractor in Structural Life-ExtensionBlog
May 12, 2026

The Role of a Specialist Engineering Contractor in Structural Life-Extension

With the UK infrastructure sector projected to grow by up to 3.9% in 2026 whilst private housing contracts, the strategic focus for asset managers...
Structural Repairs: A Technical Guide to Asset Remediation and Life-ExtensionBlog
May 11, 2026

Structural Repairs: A Technical Guide to Asset Remediation and Life-Extension

The decision to decommission a degrading asset is frequently a failure of engineering strategy rather than a terminal material exhaustion. With the...
Pipeline Rehabilitation: A Technical Guide to Asset Life-ExtensionBlog
May 8, 2026

Pipeline Rehabilitation: A Technical Guide to Asset Life-Extension

Whilst wastewater infrastructure accounted for 61.70% of the UK trenchless market in 2025, the challenge of managing assets that are often over 100...