Download our Project Insider to Find Out More

Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

Culvert Repair and Strengthening Services in the UKBlog
November 4, 2026

Culvert Repair and Strengthening Services in the UK

A culvert showing cracks, water ingress, erosion, damaged headwalls or restricted flow may need repair, refurbishment or strengthening, rather than...
Engineer inspecting CFRP laminates bonded beneath a concrete beam in a UK car parkBlog
November 3, 2026

CFRP Design Calculations for Bending Strengthening

The decisive question in bending strengthening is not simply how much CFRP can be added, but where it can contribute effectively to the required...
Concrete frame building refurbishment costs and carbon savingsBlog
November 2, 2026

Concrete frame building refurbishment costs and carbon savings

Rebuilding is not automatically the cheaper or lower-carbon option. Concrete frame building refurbishment can retain usable structure, avoiding some...