The Asticus Building
The Asticus Building

Download our Project Insider to Find Out More

The Asticus Building

Project Details

Project: Column Strengthening with Carbon Fibre

Contract Duration: 2 Weeks

Scope of Work:  To significantly add capacity to the ground floor columns of this 8 storey building whilst causing minimum disruption to the live reception area and keeping the geometry of the columns as small as possible.

CCUK provided an innovate structural solution as an alternative option to traditional methods that would have been time consuming and difficult to execute due to congestion of other buildings in the surrounding area.

If you would like to request more information, please fill out the contact form.

How to Reinforce Load-Bearing Elements Without Disruption Using CFRPBlogCCUK NewsSurface PreparationsWaterproof Solutions
March 16, 2026

What’s the Difference Between Damp Proofing and Waterproofing?

Moisture ingress is one of the most common causes of structural deterioration in buildings. However, not all moisture protection systems are the same. The terms…
How to Reinforce Load-Bearing Elements Without Disruption Using CFRPBlogBridge Strengthening and RepairsCarbon Fibre StrengtheningStructural Rehabilitation and Repair
March 9, 2026

How to Reinforce Load-Bearing Elements Without Disruption Using CFRP

Strengthening load-bearing structures has traditionally been associated with heavy steelwork, intrusive construction activity and significant downtime. For occupied buildings, operational facilities and public infrastructure, that…
What Is Carbon Fibre Strengthening and How Does It Work?BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work DivisionSprayed Concrete Services
February 16, 2026

What Is Carbon Fibre Strengthening and How Does It Work?

Carbon fibre strengthening is a modern method of repairing and upgrading existing structures without the need for major demolition or intrusive works. It’s widely used…