Project: Hill House

Client: HG Construction London

Contract Duration: 3 weeks

Scope of Works: Riser Strengthening

Phase 1 was the strengthening of floor slabs for service risers. Eleven large service risers needed to be cut in the labs at critical locations. CCUK (Fibrwrap) were responsible for the design supply and install of carbon fibre wrapping to replace cut reinforcement while forming the risers. In addition we were asked also to strengthen the shear walls within the building to allow the forming of new doorways. CCUK (Fibrwrap) also strengthened these walls using carbon fibre wrapping.

 

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…