Project: Hill House
Client: HG Construction London
Contract Duration: 3 weeks
Scope of Works: Riser Strengthening
Phase 1 was the strengthening of floor slabs for service risers. Eleven large service risers needed to be cut in the labs at critical locations. CCUK (Fibrwrap) were responsible for the design supply and install of carbon fibre wrapping to replace cut reinforcement while forming the risers. In addition we were asked also to strengthen the shear walls within the building to allow the forming of new doorways. CCUK (Fibrwrap) also strengthened these walls using carbon fibre wrapping.