Project: Bridge Repair and Strengthening Works A69
Client: Roadlink A69
Contract Duration: 10 days
Scope of Works: Concrete repair and protection with Fibre Reinforced polymers
12 bridge pier columns required concrete repairs and protection on the busy A69 in Northumberland. The piers were excavated to a depth of 0.5m below ground level. They were then cleaned and repaired using traditional concrete repair techniques. A long term protection system using Fibrwrap Systems (Fibre Reinforced Polymers) was then applied to the bottom 2m of the pier columns to protect from external corrosion and delamination.