Carbon Fibre Strengthening for additional loads in a Marine Environment
Carbon Fibre Strengthening for additional loads in a Marine Environment

Request more information

Project Details

Project: Shell Pier, Gosport

Client: BAE Systems

Contract Duration: 16 weeks

Scope of Works: Carbon Fibre strengthening of Pier Column

Composites Construction UK (Fibrwrap) was appointed as principle contractor for the repair and strengthening project that also included diamond drilling and the installation of the superstructure that will carry the new radar. CCUK has carried out specilaist surface preparations, concrete repairs, carbon fibre strengthening and protective coatings as part of the whole scheme.

If you would like to request more information, please fill out the contact form.

How Durable and Reliable is FRP (Fibre Reinforced Polymer)? BlogCarbon Fibre Strengthening
April 11, 2022

How Durable and Reliable is FRP (Fibre Reinforced Polymer)?

A detailed article exploring how durable and reliable FRP is, based upon 25 years of durability testing Over the last 25 years especially (3), our…
The Do's and Don'ts of Using Carbon Fibre Strengthening Materials BlogCarbon Fibre Strengthening
February 1, 2022

The Do’s and Don’ts of Using Carbon Fibre Strengthening Materials

A comprehensive guide offering technical advice about carbon fibre strengthening materials and how to properly prepare and handle carbon fibre composites Carbon fibre is a…
Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures? BlogCarbon Fibre Strengthening
February 1, 2022

Is Carbon Fibre a Sustainable Material for Strengthening Buildings and Structures?

In this comprehensive guide, we answer the important question of `is carbon fibre a sustainable material?` and more questions about environmentally-friendly strengthening solutions   When…