Project: Shell Pier, Gosport
Client: BAE Systems
Contract Duration: 16 weeks
Scope of Works: Carbon Fibre strengthening of Pier Column
Composites Construction UK (Fibrwrap) was appointed as principle contractor for the repair and strengthening project that also included diamond drilling and the installation of the superstructure that will carry the new radar. CCUK has carried out specilaist surface preparations, concrete repairs, carbon fibre strengthening and protective coatings as part of the whole scheme.