Carbon Fibre Strengthening for additional loads in a Marine Environment
Carbon Fibre Strengthening for additional loads in a Marine Environment

Request more information

Project Details

Project: Shell Pier, Gosport

Client: BAE Systems

Contract Duration: 16 weeks

Scope of Works: Carbon Fibre strengthening of Pier Column

Composites Construction UK (Fibrwrap) was appointed as principle contractor for the repair and strengthening project that also included diamond drilling and the installation of the superstructure that will carry the new radar. CCUK has carried out specilaist surface preparations, concrete repairs, carbon fibre strengthening and protective coatings as part of the whole scheme.

If you would like to request more information, please fill out the contact form.

Coffee & Catch-up with CCUK BlogCCUK News
October 12, 2021

Coffee & Catch-up with CCUK

We’ve got some brilliant news to share – our full team is back in the office, which means face-to-face client meetings can resume! Our structural…
Different Types of Corrosion in Offshore Structures BlogCarbon Fibre Strengthening
October 11, 2021

Different Types of Corrosion in Offshore Structures

Types of corrosion in offshore structures & the best marine corrosion inhibitors explained Corrosion is a number one cause of deterioration in buildings and structures…
Your Quick Guide to Abrasive and Sponge Jet Blasting BlogSurface Preparations
October 11, 2021

Your Quick Guide to Abrasive and Sponge Jet Blasting

What is abrasive and sponge jet blasting used for? Abrasive blasting is a reliable, effective method of cleaning and preparing surfaces – it’s as old…