Project Details

Project: Shell Pier, Gosport

Client: BAE Systems

Contract Duration: 16 weeks

Scope of Works: Carbon Fibre strengthening of Pier Column

Composites Construction UK (Fibrwrap) was appointed as principle contractor for the repair and strengthening project that also included diamond drilling and the installation of the superstructure that will carry the new radar. CCUK has carried out specilaist surface preparations, concrete repairs, carbon fibre strengthening and protective coatings as part of the whole scheme.

If you would like to request more information, please fill out the contact form.

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods BlogCarbon Fibre StrengtheningConcrete Repairs & Specialist Work Division
July 28, 2021

How to Strengthen Weak Concrete Columns: Including Our Top 3 Methods

How to strengthen concrete columns? Column strengthening is a process within concrete repairs that involves adding or restoring to the `load capacity`, or how much…
'Concrete Goals' by Business Works Magazine Blog
July 23, 2021

‘Concrete Goals’ by Business Works Magazine

Composites Construction UK (CCUK) founder Jamie Dempster is targeting the Humber and M62 energy corridor with his expanded range of structural repair services. He talks…
Top 3 Pipe Rehabilitation Methods BlogPipeline & Liquid Storage
July 19, 2021

Top 3 Pipe Rehabilitation Methods

Which pipe rehabilitation method should I choose? Pipe rehabilitation is common practice for ageing pipelines or those that have carried large volumes of liquid repeatedly,…