SHEAR STRENGTHENING OF CONCRETE BEAMS TO ALLOW DRILLING AND PASSAGE OF HVAC VENTILATION DUCTING

Duration:

3 Weeks

Wolo House
Wolo House

Project Details

Scope of Work: WOLO is a prime office space located in the bustling heart of Birmingham City Centre, offering Grade A workspaces with modern, eco-friendly designs. The building boasts impressive views of the city through floor-to-ceiling windows and spacious, open-plan layouts. Its central location and high-quality facilities make it an ideal base for businesses looking for a dynamic, accessible working environment.

The Challenge

As part of a major improvement project, the client required new air handling ducts to be installed. Due to head height restrictions, these ducts needed to pass through 23 existing reinforced concrete beams. Given the limited clearance—just millimetres at both the top and bottom of each beam—extreme precision was required when drilling 300mm holes. It was crucial to avoid cutting through any additional reinforcement within the beams, as this could weaken the structure and compromise safety.

The Solution

The project called for a lightweight yet durable solution to reinforce the beams around the newly drilled openings. Carbon fibre strengthening was selected for its thinness, high tensile strength, and ease of installation. CCUK’s team of skilled technicians meticulously prepared the concrete surfaces surrounding each of the new openings, ensuring an optimal surface for the carbon fibre application.

To distribute and manage the stresses that the drilled openings introduced, the team applied two layers of Fibre wrap, CCUK’s specialised carbon fibre strengthening system. This system was specifically designed to transfer any stress from the cut reinforcements to the surrounding structure, providing additional strength without compromising beam integrity.

The Result

The project was completed successfully, with all air handling ducts installed precisely and with the building’s structural integrity fully maintained. The carbon fibre reinforcement solution provided a seamless, effective way to strengthen the beams without adding bulk or compromising ceiling height. The enhanced air handling system now complements WOLO’s modern, eco-friendly facilities, supporting its commitment to sustainability and functionality. The result is a robust, upgraded office environment that is equipped to meet both current needs and future demands.

How Our Waterproofing Systems Protect Against Long-Term Structural DamageBlogWaterproof Solutions
August 19, 2025

How Our Waterproofing Systems Protect Against Long-Term Structural Damage

Water may be essential for life, but it’s one of the most destructive forces a structure can face. Over time, moisture infiltration can weaken concrete,…
Avoid Demolition Costs: Strengthen Instead with Carbon FibreBlogConcrete Repairs & Specialist Work DivisionConcrete Repairs & Specialist Work DivisionStructural Strengthening Division
August 18, 2025

Avoid Demolition Costs: Strengthen Instead with Carbon Fibre

As buildings and structures age or sustain damage, costly demolition and rebuild may seem inevitable. However, for a growing number of projects, there’s a smarter…
Do You Really Need Waterproofing for Your Commercial Building?BlogCCUK NewsConcrete Repairs & Specialist Work DivisionSurface PreparationsWaterproof Solutions
July 14, 2025

Do You Really Need Waterproofing for Your Commercial Building?

When managing or maintaining a commercial property, waterproofing might not always be at the top of your to-do list. However, neglecting it can lead to…