Power Station Pipe Strengthening

Project Details

Project: Humber Power Station

Client: SHB Power

Contract Duration: 4 days

Scope of Work: Repair and strengthening of Cooling water inlet pipes from scouring and erosion using Tyfo Fibrwrap FRP systems and Tyfo specialist under
water epoxy

Power Station Pipe Strengthening

South Humber Bank Power Station (SHB) had a leak remediation and strengthening issue on their cooling water intake pipes. During a planned shutdown CCUK carried out extensive internal repairs, leak sealing and carbon fibre strengthening to these critical pieces of infrastructure.