Project: Humber Power Station
Client: SHB Power
Contract Duration: 4 days
Scope of Work: Repair and strengthening of Cooling water inlet pipes from scouring and erosion using Tyfo Fibrwrap FRP systems and Tyfo specialist under
water epoxy
South Humber Bank Power Station (SHB) had a leak remediation and strengthening issue on their cooling water intake pipes. During a planned shutdown CCUK carried out extensive internal repairs, leak sealing and carbon fibre strengthening to these critical pieces of infrastructure.