Column Repair and Strengthening - Northumberland

Project Details

Project: Bridge Repair and Strengthening Works A69

Client: Roadlink A69

Contract Duration: 10 days

Scope of Works: Concrete repair and protection with Fibre Reinforced polymers.

Column Repair and Strengthening - Northumberland

12 bridge pier columns required concrete repairs and protection on the busy A69 in Northumberland. The piers were excavated to a depth of 0.5m below ground level. They were then cleaned and repaired using traditional concrete repair techniques. A long term protection system using Fibrwrap Systems (Fibre Reinforced Polymers) was then applied to the bottom 2m of the pier columns to protect from external corrosion and delamination.